4 windows were replaced in the courthouse library and the interior openings needed to be reshaped with lath and plastered back to the original look blending in with the exsisting walls. The 5th window only needed plaster lath repairs.
Perth Courthouse Library 43 Drummond St E
Finished window ready for primer and paint
Application of finish coat over base coat to smooth final finish and blend in with existing wall plaster
Window with first plaster base coat applied, window taking shape
Application of basecoat plaster onto lath ensuring a good key through the mesh for bonding